BJC Metro Heart Wentzville Outpatient Center
This Fire Solutions project consisted of adding and relocating fire sprinklers from the existing fire sprinkler system to provide proper coverage for the architectural changes made during renovation. White standard coverage quick response concealor fire sprinkler heads to be utilized in all ceilings to match the existing fire sprinkler heads. All design, material, fabrication and installation were done per NFPA 13. Fire Solutions was responsible for obtaining the necessary permits for the work. All new arm-overs, drops and/or sprigs installed were black schedule 40 threaded pipe and fittings.
Project Details
Location
Wentzville, MO
ClientBarnes Jewish Christian
Project TypeHealthcare
ContractorTW Constructors